6 Great Marlborough Street (Manchester Metropolitan University)
Client: Manchester Metropolitan University I Value: £8m I Completed: September 2018 I Facilities: Refurbishment of an existing mill building to provide support facility offices for the University.
Aspect Court, Sheffield Hallam University
Client: Sheffield Hallam University I Value: £1m I Completed: October 2018 I Facilities: Student teaching refurbishment on levels 5 and 6 of Aspect Court
Birley Fields Student Accommodation
Client: Manchester Metropolitan University I Value: £29m I Completion: 2022 I Facilities: Construction of three blocks of student accommodation comprising 6, 11 and 16 storeys. The scheme is 491 beds with an internal gross floor area of 12,916m2. The ground floor will also include a state-of-the-art gym and group study areas.
Chatham Kitchen, Manchester Metropolitan University
Client: Manchester Metropolitan University I Value: £1m I Completed: November 2016 I Facilities: Install new kitchen to the ground floor of the Chatham building with associated internal remodelling and construction of new external bin store
First Light Pavilion, Jodrell Bank
Client: University of Manchester | Value: £20.5m | Completed: September 2021 | Facilities: The grass-covered dome shaped building hosts a gallery, immersive projection space, auditorium for live events and a café for visitors to use. Within the dome are a number of cutaways including the Pavilion’s entrance built into a curved concrete wall designed to reflect the arc of the sun. Two separate walls that guide visitors in, with a single glass slot cut out at the centre, illuminating a meridian line cast onto the floor at the entrance, echoing a history of astronomy in architecture.
Lancaster University - Flyde Building, Phase 1 and 2
Client: Lancaster University I Value: Phase 1 - £400k, Phase 2 £2.5m I Completed: Phase 1 - December 2016, Phase 2 - May 2018 I Facilities: Building fabric repairs to the Flyde Building including installation of previously procured windows, cavity wall structural insulation, localised brick pointing repairs
Lancaster University – Sports Hall Extension
Client: Lancaster University I Value: £1.7m I Completed: December 2018 I Facilities: 400m2 extension to the existing gym providing a high performance conditioning suite and human performance laboratory for Client use I Framework: SCAPE
Liverpool John Moore University Lecture Theatre Upgrade
Client: Liverpool John Moores University I Value: £1.3m I Completed: September 2018 I Facilities: Removal and replacement of existing seating and replacement with new in different layouts, new finishes and upgrade works to M&E and new AV installations.
Robert Winston Annexe, Sheffield Hallam University
Client: Sheffield Hallam University I Value: £1.4m I Completed: January 2018 I Facilities: student teaching accommodation
School of Digital Arts (SODA)
Client: Manchester Metropolitan University I Value: £19.5m I Completed: September 2021 I Description of works: The building is a five-storey concrete frame building with visually impressive external elevations. Internally it contains a variety of technical spaces including a digital and media gallery, café and digital hall, lecture and seminar rooms, digital innovation lab, virtual reality studio and a range of film, production, photo and music studios
Sensor City, Liverpool
Client: Sensor City (University of Liverpool and Liverpool John Moore’s University) I Value: £9.3m I Completed: March 2017 I Facilities: Design and construction of a new 2,152m2 building to provide flexible labs and offices to establish works for a sensor systems business, with associated fit-out and landscaping I Awards won - North West Regional Construction Award 2018
Teesside University Library Refurbishment
Client: Teesside University I Value: £3.5m I Completed: 2017 I Facilities: Refurbishment of floors 1, 2, 3 & 4 to provide new library and associated accommodation including additional steel framing, curtain walling, M&E, fit out works.
University of Manchester Museum Courtyard
Client: University of Manchester I Value: £8.5m I Completed: Autumn 2021 I Facilities: Construction of a new 2 storey extension within the Manchester Museum courtyard area to provide new gallery space and alterations facing Coupland Street linking back to the existing Museum. New Museum entrance to Bridgeford Street and associated internal remodelling works within the existing building, along with associated external works.
York St John University Creative Centre
Client: York St John University I Value: £13m I Completed: November 2021 I Description of works: The project has created a new home for digital arts, creative studies and the performing arts. It includes a new auditorium, TV studio, recital areas and set building workshops